RERA Completed projects in Jharsuguda. Resale Properties in India. RERA Completed Projects in Jharsuguda (0 project) Disclaimer. Sinhgad Management Institutes (MBA/MCA) work at shaping next generation business leaders.
Erkunde ihintennachs Pinnwand „Kostenlose klaviernoten“ auf Pinterest. Weitere Ideen zu Kostenlose klaviernoten, Klaviernoten und Klavier. River Flows In You Sheet Music Yiruma Piano Sheet Free - Jan W. Kostenlose Noten und Melodien zum Ausdrucken und Mitsingen.
Contents • • • • • • • • • • • • • • • • • • Construction history [ ] Before the devastating floods of 1936, Sir proposed a detailed investigation for storage reservoirs in the Mahanadi basin to tackle the problem of floods in the delta. In 1945, under the chairmanship of Dr., the Member of Labour, it was decided to invest in the potential benefits of controlling the Mahanadi for multi-purpose use.
The Central Waterways, Irrigation and Navigation Commission took up the work. On 15 Mar 1946, Sir Hawthrone Lewis, the Governor of Odisha, laid the foundation stone of the Hirakud Dam. A project report was submitted to the government in June 1947. Pandit laid the first batch of concrete on 12 April 1948. The dam was completed in 1953 and was formally inaugurated by Prime Minister on 13 January 1957. The total cost of the project was ₹1,000.2 million (equivalent to ₹70 billion or US$1.1 billion in 2016) in 1957.
Power generation along with agricultural irrigation started in 1956, achieving full potential in 1966. Technical details [ ]. Sasan Canal Technical Details Total Length 25.79 km (16.03 mi) Length 4.8 km (3.0 mi) Artificial Lake 743 km 2 (287 sq mi) Irrigated Area (both crop) 2,355 km 2 (235,477 ha) Area lost in construction of Dam 596 km 2 (147,363 acres) Installed Capacity (Power Generation) 347.5 MW Cost (in 1957) ₹1,000.2 million (equivalent to ₹70 billion or US$1.1 billion in 2016) Top dam level R.L. 195.680 m (642 ft) F.R.L/ M.W.L R.L.
192.024 m (630 ft) Dead storage level R.L. 179.830 m (590 ft) Total quantity of earth work in Dam 18,100,000 m 3 (640 × 10 ^ 6 cu ft) Total quantity of concrete 1,070,000 m 3 (38 × 10 ^ 6 cu ft) Catchment 83,400 km 2 (32,200 sq mi) Structure [ ] The Hirakud Dam is a composite structure of earth, concrete and masonry.
10 km (6.2 mi) north of, it is the longest major in, measuring 25.8 km (16.0 mi) including dykes, and stands across the river Mahanadi. The main dam has an overall length of 4.8 km (3.0 mi) spanning between two hills; the Lamdungri on the left and the Chandili Dunguri on the right. The dam is flanked by 21 km (13 mi) of earthen on both the left and right sides, closing the low saddles beyond the adjoining hills.
The dam and dykes together measure 25.8 km (16.0 mi). It also forms the biggest in, [ – ] with a holding 743 km 2 (287 sq mi) at full capacity, with a shoreline of over 639 km (397 mi). There are two observation towers on the dam one at each side.
One is 'Gandhi Minar' and the other one is'Nehru Minar'. Both the observation towers present extensive views of the lake. Power houses [ ] The dam supports two different power houses. Power House I is located at the base (toe) of the main dam section and contains 3 x 37.5 MW and 2 x 24 MW Francis turbine generators for an installed capacity of 259.5 MW. Power Station II is located 19 km (12 mi) southeast of the dam at Chipilima. It contains 3 x 24 MW generators. The entire installed capacity of the dam's power houses is 307.5 MW.
I and II were built in three stages. During stage I, four generators were installed at PH I and in stage II, the power channel two and Power House II was constructed. All three generators were installed at PH II along with two more at PH I by 1963. Between 1982 and 1990, the seventh and final generator was installed at PH I. Left Dyke of Hirakud Dam In the upper drainage basin of the Mahanadi River, centered on the Plain, periodic droughts contrast with the situation in the lower delta region where floods may damage crops.
The dam was constructed to help alleviate these problems by creating a reservoir and controlling river flow through the drainage system. The dam regulates the flow of the Mahanadi River and produces hydroelectricity through several hydroelectric plants.
The dam helps control floods in the Mahanadi delta and irrigates 75,000 km 2 (19 × 10 ^ 6 acres) of land. Hydroelectricity is also generated. The Hirakud Dam regulates 83,400 km 2 (20.6 × 10 ^ 6 acres) of Mahanadi's drainage. The reservoir has a storage capacity of 5.818 km 3 (1.396 cu mi) with gross of 8.136 km 3 (1.952 cu mi). It drains an area of 133,090 km 2 (32.89 × 10 ^ 6 acres), more than twice the area of. The amount of earth, concrete and masonry materials used to build the dam is sufficient to make a road 8 m (26 ft) wide and pave it from to and from to in.
With successful irrigation provided by the dam, is called the rice bowl of. The project provides 1,556 km 2 (384,000 acres) of and 1,084 km 2 (268,000 acres) of irrigation in districts of Sambalpur, and Subarnpur. The water released by the power plant irrigates another 4,360 km 2 (1.08 × 10 ^ 6 acres) of in Mahanadi delta. The dam can generate up to 307.5 MW of electrical power through its two power plants at Burla, on the dam's right bank and Chiplima, 22 km (14 mi) downstream from the dam. In addition, the project provides flood protection to 9,500 km 2 (2.3 × 10 ^ 6 acres) of delta area in district of and. Chiplima has gained prominence as the second hydroelectric project of the Hirakud Dam. A natural fall of 80 to 120 ft (24 to 37 m) in the river Mahanadi is used to generate electricity.
The place is mostly inhabited by fishermen, whose deity Ghanteswari is revered in the neighboring area. The state livestock breeding farm and agricultural farm are located here. Canal System [ ] Hirakud Dam has three canals, namely, Sason Canal and Sambalpur Canal. Bargarh Main canal has a water discharge rate of 4000 cusecs.
Industrial Use [ ] Water from Hirakud Dam at a later stage was allocated to various industries, primarily for mineral processing and coal fired thermal power plants in and districts. Siltation [ ] As per statistics published by the dam authority, water holding capacity of the dam has been reduced by 28% due to siltation. Water Conflict [ ] The major conflict for water was reported when over 30,000 farmers gathered around the dam making human chain, protesting the allocation of water to the industries and there was no water for the canal system due to low water level. Inter-basin Water Transfer [ ] There has been plans for inter-basin water transfer, as per plans of the water resource dept of as part of 's ambitious. Lost temples [ ] These are remnants of temples submerged after the dam was completed in 1957. In the season, the receding water of the dam makes the structures become visible.
The hidden treasures have finally caught the attention of historians, and steps are being taken to understand the historical significance of these temples, which periodically go under water, only to resurface again. Many temples have been destroyed after 58 years of underwater existence. However, some remain intact. Interest in these lost temples has been rekindled after two stones, etched with writing ('Shila Lekha'), were recovered from what is believed to be the Padmaseni temple of submerged Padmapur village. The temples located inside the reservoir area were part of the then Padmapur, one of the oldest and most populous in the region prior to the dam construction. More than 200 temples were submerged by the dam, nearly 150 temples have either perished or are underwater and about 50 are visible during summer. The lost temples present excellent opportunities for enthusiasts to explore the underbelly of Hirakud Dam.
The temple are visible to visitors on boat only during the summer months of May and June. Cattle Island [ ]. One of the many islands within Hirakud Reservoir Cattle Island is located in one of the extreme points of Hirakud Reservoir, a natural wonder.
Completely inhabited by wild, without any trace of humans. It is near Kumarbandh village of Belpahar-Banharpali range which is about 90 km (56 mi) from. Carson montana manual. It can be reached by from Hirakud Dam, it is closer by 10 km (6.2 mi) via the river. The island is a submerged hill, and before the construction of Hirakud Dam it was a developed village. During the resettlement period, villagers left some of their cattle behind; when the dam construction was over, the cattle settled on the hilltop. With the passage of time the nearby area filled up with the reservoir water, turning the hilltop into an island.
Being away from mankind, the cattle are now wild, very swift and not easily caught. Living on a hilltop with dense forest, they are larger than tame cattle, almost all of which are white in color. Nearby residents attempt to capture these animals from time to time, but these hunts are rarely successful.
Though descended from tame cattle, these animals provide a contrasting picture of this breed of animal returning to life in the wild. Wildlife [ ] The dam with the channel provides an ideal environment for the wildlife. The Debrigarh wildlife sanctuary is located here. Several species of migratory birds visit the reservoir during winter.
Nearly 20-25 species of birds are seen in the reservoir and common among them are, and several others. People affected by the dam construction [ ] The main purpose of the Hirakud Dam was to check the massive floods that were affecting a large part of coastal Odisha. But, the construction of the dam greatly affected the natives of the western part of Odisha. Nearly 150,000 people were affected by the Hirakud project and nearly 22,000 families were displaced. In the original estimate, an amount of ₹120 million (equivalent to ₹9.6 billion or US$150 million in 2016) was provided for payment of compensation to the affected people. After revision, the amount was reduced to ₹95 million (equivalent to ₹7.6 billion or US$120 million in 2016) and the total compensation paid to the people was, in reality, only ₹33.2 million (equivalent to ₹2.7 billion or US$41 million in 2016).
A large number of families were evacuated from their hearth and homes without compensation from 1956 onwards. Stamps and notes [ ] A commemorative stamp on Hirakud Dam was released on 29 Oct 1979 by the Department of Posts, with denomination 30 paise (0. Versapro 2 04 Software Companies. 47¢ US), 3,000,000 stamps issued. A hundred rupee note was issued on 26 December 1960 by RBI Governor H.V.R. The size of this note is 109 mm × 172 mm (4.3 in × 6.8 in). On the back side of this note there are thirteen regional languages along with an image of the Hirakud Dam and Hydro-Electric station.
- Thursday 28 December
- 34
Popular Posts
RERA Completed projects in Jharsuguda. Resale Properties in India. RERA Completed Projects in Jharsuguda (0 project) Disclaimer. Sinhgad Management Institutes (MBA/MCA) work at shaping next generation business leaders.
Erkunde ihintennachs Pinnwand „Kostenlose klaviernoten“ auf Pinterest. Weitere Ideen zu Kostenlose klaviernoten, Klaviernoten und Klavier. River Flows In You Sheet Music Yiruma Piano Sheet Free - Jan W. Kostenlose Noten und Melodien zum Ausdrucken und Mitsingen.
Contents • • • • • • • • • • • • • • • • • • Construction history [ ] Before the devastating floods of 1936, Sir proposed a detailed investigation for storage reservoirs in the Mahanadi basin to tackle the problem of floods in the delta. In 1945, under the chairmanship of Dr., the Member of Labour, it was decided to invest in the potential benefits of controlling the Mahanadi for multi-purpose use.
The Central Waterways, Irrigation and Navigation Commission took up the work. On 15 Mar 1946, Sir Hawthrone Lewis, the Governor of Odisha, laid the foundation stone of the Hirakud Dam. A project report was submitted to the government in June 1947. Pandit laid the first batch of concrete on 12 April 1948. The dam was completed in 1953 and was formally inaugurated by Prime Minister on 13 January 1957. The total cost of the project was ₹1,000.2 million (equivalent to ₹70 billion or US$1.1 billion in 2016) in 1957.
Power generation along with agricultural irrigation started in 1956, achieving full potential in 1966. Technical details [ ]. Sasan Canal Technical Details Total Length 25.79 km (16.03 mi) Length 4.8 km (3.0 mi) Artificial Lake 743 km 2 (287 sq mi) Irrigated Area (both crop) 2,355 km 2 (235,477 ha) Area lost in construction of Dam 596 km 2 (147,363 acres) Installed Capacity (Power Generation) 347.5 MW Cost (in 1957) ₹1,000.2 million (equivalent to ₹70 billion or US$1.1 billion in 2016) Top dam level R.L. 195.680 m (642 ft) F.R.L/ M.W.L R.L.
192.024 m (630 ft) Dead storage level R.L. 179.830 m (590 ft) Total quantity of earth work in Dam 18,100,000 m 3 (640 × 10 ^ 6 cu ft) Total quantity of concrete 1,070,000 m 3 (38 × 10 ^ 6 cu ft) Catchment 83,400 km 2 (32,200 sq mi) Structure [ ] The Hirakud Dam is a composite structure of earth, concrete and masonry.
10 km (6.2 mi) north of, it is the longest major in, measuring 25.8 km (16.0 mi) including dykes, and stands across the river Mahanadi. The main dam has an overall length of 4.8 km (3.0 mi) spanning between two hills; the Lamdungri on the left and the Chandili Dunguri on the right. The dam is flanked by 21 km (13 mi) of earthen on both the left and right sides, closing the low saddles beyond the adjoining hills.
The dam and dykes together measure 25.8 km (16.0 mi). It also forms the biggest in, [ – ] with a holding 743 km 2 (287 sq mi) at full capacity, with a shoreline of over 639 km (397 mi). There are two observation towers on the dam one at each side.
One is 'Gandhi Minar' and the other one is'Nehru Minar'. Both the observation towers present extensive views of the lake. Power houses [ ] The dam supports two different power houses. Power House I is located at the base (toe) of the main dam section and contains 3 x 37.5 MW and 2 x 24 MW Francis turbine generators for an installed capacity of 259.5 MW. Power Station II is located 19 km (12 mi) southeast of the dam at Chipilima. It contains 3 x 24 MW generators. The entire installed capacity of the dam's power houses is 307.5 MW.
I and II were built in three stages. During stage I, four generators were installed at PH I and in stage II, the power channel two and Power House II was constructed. All three generators were installed at PH II along with two more at PH I by 1963. Between 1982 and 1990, the seventh and final generator was installed at PH I. Left Dyke of Hirakud Dam In the upper drainage basin of the Mahanadi River, centered on the Plain, periodic droughts contrast with the situation in the lower delta region where floods may damage crops.
The dam was constructed to help alleviate these problems by creating a reservoir and controlling river flow through the drainage system. The dam regulates the flow of the Mahanadi River and produces hydroelectricity through several hydroelectric plants.
The dam helps control floods in the Mahanadi delta and irrigates 75,000 km 2 (19 × 10 ^ 6 acres) of land. Hydroelectricity is also generated. The Hirakud Dam regulates 83,400 km 2 (20.6 × 10 ^ 6 acres) of Mahanadi's drainage. The reservoir has a storage capacity of 5.818 km 3 (1.396 cu mi) with gross of 8.136 km 3 (1.952 cu mi). It drains an area of 133,090 km 2 (32.89 × 10 ^ 6 acres), more than twice the area of. The amount of earth, concrete and masonry materials used to build the dam is sufficient to make a road 8 m (26 ft) wide and pave it from to and from to in.
With successful irrigation provided by the dam, is called the rice bowl of. The project provides 1,556 km 2 (384,000 acres) of and 1,084 km 2 (268,000 acres) of irrigation in districts of Sambalpur, and Subarnpur. The water released by the power plant irrigates another 4,360 km 2 (1.08 × 10 ^ 6 acres) of in Mahanadi delta. The dam can generate up to 307.5 MW of electrical power through its two power plants at Burla, on the dam's right bank and Chiplima, 22 km (14 mi) downstream from the dam. In addition, the project provides flood protection to 9,500 km 2 (2.3 × 10 ^ 6 acres) of delta area in district of and. Chiplima has gained prominence as the second hydroelectric project of the Hirakud Dam. A natural fall of 80 to 120 ft (24 to 37 m) in the river Mahanadi is used to generate electricity.
The place is mostly inhabited by fishermen, whose deity Ghanteswari is revered in the neighboring area. The state livestock breeding farm and agricultural farm are located here. Canal System [ ] Hirakud Dam has three canals, namely, Sason Canal and Sambalpur Canal. Bargarh Main canal has a water discharge rate of 4000 cusecs.
Industrial Use [ ] Water from Hirakud Dam at a later stage was allocated to various industries, primarily for mineral processing and coal fired thermal power plants in and districts. Siltation [ ] As per statistics published by the dam authority, water holding capacity of the dam has been reduced by 28% due to siltation. Water Conflict [ ] The major conflict for water was reported when over 30,000 farmers gathered around the dam making human chain, protesting the allocation of water to the industries and there was no water for the canal system due to low water level. Inter-basin Water Transfer [ ] There has been plans for inter-basin water transfer, as per plans of the water resource dept of as part of 's ambitious. Lost temples [ ] These are remnants of temples submerged after the dam was completed in 1957. In the season, the receding water of the dam makes the structures become visible.
The hidden treasures have finally caught the attention of historians, and steps are being taken to understand the historical significance of these temples, which periodically go under water, only to resurface again. Many temples have been destroyed after 58 years of underwater existence. However, some remain intact. Interest in these lost temples has been rekindled after two stones, etched with writing ('Shila Lekha'), were recovered from what is believed to be the Padmaseni temple of submerged Padmapur village. The temples located inside the reservoir area were part of the then Padmapur, one of the oldest and most populous in the region prior to the dam construction. More than 200 temples were submerged by the dam, nearly 150 temples have either perished or are underwater and about 50 are visible during summer. The lost temples present excellent opportunities for enthusiasts to explore the underbelly of Hirakud Dam.
The temple are visible to visitors on boat only during the summer months of May and June. Cattle Island [ ]. One of the many islands within Hirakud Reservoir Cattle Island is located in one of the extreme points of Hirakud Reservoir, a natural wonder.
Completely inhabited by wild, without any trace of humans. It is near Kumarbandh village of Belpahar-Banharpali range which is about 90 km (56 mi) from. Carson montana manual. It can be reached by from Hirakud Dam, it is closer by 10 km (6.2 mi) via the river. The island is a submerged hill, and before the construction of Hirakud Dam it was a developed village. During the resettlement period, villagers left some of their cattle behind; when the dam construction was over, the cattle settled on the hilltop. With the passage of time the nearby area filled up with the reservoir water, turning the hilltop into an island.
Being away from mankind, the cattle are now wild, very swift and not easily caught. Living on a hilltop with dense forest, they are larger than tame cattle, almost all of which are white in color. Nearby residents attempt to capture these animals from time to time, but these hunts are rarely successful.
Though descended from tame cattle, these animals provide a contrasting picture of this breed of animal returning to life in the wild. Wildlife [ ] The dam with the channel provides an ideal environment for the wildlife. The Debrigarh wildlife sanctuary is located here. Several species of migratory birds visit the reservoir during winter.
Nearly 20-25 species of birds are seen in the reservoir and common among them are, and several others. People affected by the dam construction [ ] The main purpose of the Hirakud Dam was to check the massive floods that were affecting a large part of coastal Odisha. But, the construction of the dam greatly affected the natives of the western part of Odisha. Nearly 150,000 people were affected by the Hirakud project and nearly 22,000 families were displaced. In the original estimate, an amount of ₹120 million (equivalent to ₹9.6 billion or US$150 million in 2016) was provided for payment of compensation to the affected people. After revision, the amount was reduced to ₹95 million (equivalent to ₹7.6 billion or US$120 million in 2016) and the total compensation paid to the people was, in reality, only ₹33.2 million (equivalent to ₹2.7 billion or US$41 million in 2016).
A large number of families were evacuated from their hearth and homes without compensation from 1956 onwards. Stamps and notes [ ] A commemorative stamp on Hirakud Dam was released on 29 Oct 1979 by the Department of Posts, with denomination 30 paise (0. Versapro 2 04 Software Companies. 47¢ US), 3,000,000 stamps issued. A hundred rupee note was issued on 26 December 1960 by RBI Governor H.V.R. The size of this note is 109 mm × 172 mm (4.3 in × 6.8 in). On the back side of this note there are thirteen regional languages along with an image of the Hirakud Dam and Hydro-Electric station.
- Thursday 28 December
- 34
RERA Completed projects in Jharsuguda. Resale Properties in India. RERA Completed Projects in Jharsuguda (0 project) Disclaimer. Sinhgad Management Institutes (MBA/MCA) work at shaping next generation business leaders.
Erkunde ihintennachs Pinnwand „Kostenlose klaviernoten“ auf Pinterest. Weitere Ideen zu Kostenlose klaviernoten, Klaviernoten und Klavier. River Flows In You Sheet Music Yiruma Piano Sheet Free - Jan W. Kostenlose Noten und Melodien zum Ausdrucken und Mitsingen.
Contents • • • • • • • • • • • • • • • • • • Construction history [ ] Before the devastating floods of 1936, Sir proposed a detailed investigation for storage reservoirs in the Mahanadi basin to tackle the problem of floods in the delta. In 1945, under the chairmanship of Dr., the Member of Labour, it was decided to invest in the potential benefits of controlling the Mahanadi for multi-purpose use.
The Central Waterways, Irrigation and Navigation Commission took up the work. On 15 Mar 1946, Sir Hawthrone Lewis, the Governor of Odisha, laid the foundation stone of the Hirakud Dam. A project report was submitted to the government in June 1947. Pandit laid the first batch of concrete on 12 April 1948. The dam was completed in 1953 and was formally inaugurated by Prime Minister on 13 January 1957. The total cost of the project was ₹1,000.2 million (equivalent to ₹70 billion or US$1.1 billion in 2016) in 1957.
Power generation along with agricultural irrigation started in 1956, achieving full potential in 1966. Technical details [ ]. Sasan Canal Technical Details Total Length 25.79 km (16.03 mi) Length 4.8 km (3.0 mi) Artificial Lake 743 km 2 (287 sq mi) Irrigated Area (both crop) 2,355 km 2 (235,477 ha) Area lost in construction of Dam 596 km 2 (147,363 acres) Installed Capacity (Power Generation) 347.5 MW Cost (in 1957) ₹1,000.2 million (equivalent to ₹70 billion or US$1.1 billion in 2016) Top dam level R.L. 195.680 m (642 ft) F.R.L/ M.W.L R.L.
192.024 m (630 ft) Dead storage level R.L. 179.830 m (590 ft) Total quantity of earth work in Dam 18,100,000 m 3 (640 × 10 ^ 6 cu ft) Total quantity of concrete 1,070,000 m 3 (38 × 10 ^ 6 cu ft) Catchment 83,400 km 2 (32,200 sq mi) Structure [ ] The Hirakud Dam is a composite structure of earth, concrete and masonry.
10 km (6.2 mi) north of, it is the longest major in, measuring 25.8 km (16.0 mi) including dykes, and stands across the river Mahanadi. The main dam has an overall length of 4.8 km (3.0 mi) spanning between two hills; the Lamdungri on the left and the Chandili Dunguri on the right. The dam is flanked by 21 km (13 mi) of earthen on both the left and right sides, closing the low saddles beyond the adjoining hills.
The dam and dykes together measure 25.8 km (16.0 mi). It also forms the biggest in, [ – ] with a holding 743 km 2 (287 sq mi) at full capacity, with a shoreline of over 639 km (397 mi). There are two observation towers on the dam one at each side.
One is 'Gandhi Minar' and the other one is'Nehru Minar'. Both the observation towers present extensive views of the lake. Power houses [ ] The dam supports two different power houses. Power House I is located at the base (toe) of the main dam section and contains 3 x 37.5 MW and 2 x 24 MW Francis turbine generators for an installed capacity of 259.5 MW. Power Station II is located 19 km (12 mi) southeast of the dam at Chipilima. It contains 3 x 24 MW generators. The entire installed capacity of the dam's power houses is 307.5 MW.
I and II were built in three stages. During stage I, four generators were installed at PH I and in stage II, the power channel two and Power House II was constructed. All three generators were installed at PH II along with two more at PH I by 1963. Between 1982 and 1990, the seventh and final generator was installed at PH I. Left Dyke of Hirakud Dam In the upper drainage basin of the Mahanadi River, centered on the Plain, periodic droughts contrast with the situation in the lower delta region where floods may damage crops.
The dam was constructed to help alleviate these problems by creating a reservoir and controlling river flow through the drainage system. The dam regulates the flow of the Mahanadi River and produces hydroelectricity through several hydroelectric plants.
The dam helps control floods in the Mahanadi delta and irrigates 75,000 km 2 (19 × 10 ^ 6 acres) of land. Hydroelectricity is also generated. The Hirakud Dam regulates 83,400 km 2 (20.6 × 10 ^ 6 acres) of Mahanadi's drainage. The reservoir has a storage capacity of 5.818 km 3 (1.396 cu mi) with gross of 8.136 km 3 (1.952 cu mi). It drains an area of 133,090 km 2 (32.89 × 10 ^ 6 acres), more than twice the area of. The amount of earth, concrete and masonry materials used to build the dam is sufficient to make a road 8 m (26 ft) wide and pave it from to and from to in.
With successful irrigation provided by the dam, is called the rice bowl of. The project provides 1,556 km 2 (384,000 acres) of and 1,084 km 2 (268,000 acres) of irrigation in districts of Sambalpur, and Subarnpur. The water released by the power plant irrigates another 4,360 km 2 (1.08 × 10 ^ 6 acres) of in Mahanadi delta. The dam can generate up to 307.5 MW of electrical power through its two power plants at Burla, on the dam's right bank and Chiplima, 22 km (14 mi) downstream from the dam. In addition, the project provides flood protection to 9,500 km 2 (2.3 × 10 ^ 6 acres) of delta area in district of and. Chiplima has gained prominence as the second hydroelectric project of the Hirakud Dam. A natural fall of 80 to 120 ft (24 to 37 m) in the river Mahanadi is used to generate electricity.
The place is mostly inhabited by fishermen, whose deity Ghanteswari is revered in the neighboring area. The state livestock breeding farm and agricultural farm are located here. Canal System [ ] Hirakud Dam has three canals, namely, Sason Canal and Sambalpur Canal. Bargarh Main canal has a water discharge rate of 4000 cusecs.
Industrial Use [ ] Water from Hirakud Dam at a later stage was allocated to various industries, primarily for mineral processing and coal fired thermal power plants in and districts. Siltation [ ] As per statistics published by the dam authority, water holding capacity of the dam has been reduced by 28% due to siltation. Water Conflict [ ] The major conflict for water was reported when over 30,000 farmers gathered around the dam making human chain, protesting the allocation of water to the industries and there was no water for the canal system due to low water level. Inter-basin Water Transfer [ ] There has been plans for inter-basin water transfer, as per plans of the water resource dept of as part of 's ambitious. Lost temples [ ] These are remnants of temples submerged after the dam was completed in 1957. In the season, the receding water of the dam makes the structures become visible.
The hidden treasures have finally caught the attention of historians, and steps are being taken to understand the historical significance of these temples, which periodically go under water, only to resurface again. Many temples have been destroyed after 58 years of underwater existence. However, some remain intact. Interest in these lost temples has been rekindled after two stones, etched with writing ('Shila Lekha'), were recovered from what is believed to be the Padmaseni temple of submerged Padmapur village. The temples located inside the reservoir area were part of the then Padmapur, one of the oldest and most populous in the region prior to the dam construction. More than 200 temples were submerged by the dam, nearly 150 temples have either perished or are underwater and about 50 are visible during summer. The lost temples present excellent opportunities for enthusiasts to explore the underbelly of Hirakud Dam.
The temple are visible to visitors on boat only during the summer months of May and June. Cattle Island [ ]. One of the many islands within Hirakud Reservoir Cattle Island is located in one of the extreme points of Hirakud Reservoir, a natural wonder.
Completely inhabited by wild, without any trace of humans. It is near Kumarbandh village of Belpahar-Banharpali range which is about 90 km (56 mi) from. Carson montana manual. It can be reached by from Hirakud Dam, it is closer by 10 km (6.2 mi) via the river. The island is a submerged hill, and before the construction of Hirakud Dam it was a developed village. During the resettlement period, villagers left some of their cattle behind; when the dam construction was over, the cattle settled on the hilltop. With the passage of time the nearby area filled up with the reservoir water, turning the hilltop into an island.
Being away from mankind, the cattle are now wild, very swift and not easily caught. Living on a hilltop with dense forest, they are larger than tame cattle, almost all of which are white in color. Nearby residents attempt to capture these animals from time to time, but these hunts are rarely successful.
Though descended from tame cattle, these animals provide a contrasting picture of this breed of animal returning to life in the wild. Wildlife [ ] The dam with the channel provides an ideal environment for the wildlife. The Debrigarh wildlife sanctuary is located here. Several species of migratory birds visit the reservoir during winter.
Nearly 20-25 species of birds are seen in the reservoir and common among them are, and several others. People affected by the dam construction [ ] The main purpose of the Hirakud Dam was to check the massive floods that were affecting a large part of coastal Odisha. But, the construction of the dam greatly affected the natives of the western part of Odisha. Nearly 150,000 people were affected by the Hirakud project and nearly 22,000 families were displaced. In the original estimate, an amount of ₹120 million (equivalent to ₹9.6 billion or US$150 million in 2016) was provided for payment of compensation to the affected people. After revision, the amount was reduced to ₹95 million (equivalent to ₹7.6 billion or US$120 million in 2016) and the total compensation paid to the people was, in reality, only ₹33.2 million (equivalent to ₹2.7 billion or US$41 million in 2016).
A large number of families were evacuated from their hearth and homes without compensation from 1956 onwards. Stamps and notes [ ] A commemorative stamp on Hirakud Dam was released on 29 Oct 1979 by the Department of Posts, with denomination 30 paise (0. Versapro 2 04 Software Companies. 47¢ US), 3,000,000 stamps issued. A hundred rupee note was issued on 26 December 1960 by RBI Governor H.V.R. The size of this note is 109 mm × 172 mm (4.3 in × 6.8 in). On the back side of this note there are thirteen regional languages along with an image of the Hirakud Dam and Hydro-Electric station.
- Thursday 28 December
- 34